Free quote Menu

Design, build and install

Kitchen Renovation Kitchener

One crew, from the first measure to the last cabinet door.

Kitchen renovation in Kitchener, Waterloo and Cambridge, planned in your home, built in our own cabinet workshop and installed by the people who made it. One written quote, one schedule and one team to call, from strip-out to the final clean.

Kitchen renovation in Kitchener: white shaker cabinets, mullion-glass uppers, a black hood surround and veined quartz
Our kitchen in Doon South, Kitchener, September 2026 [TBC: operator to confirm caption]
  • Own cabinet workshopEvery cabinet built by our team in Ontario
  • Designed in your homeNo showroom: we measure and draw on site
  • Quoted in writingLine by line, in CAD plus HST
  • All of Waterloo RegionKitchener, Waterloo, Cambridge and the townships

What a kitchen reno in Kitchener actually includes

Updated

Kitchen Renovation Kitchener renovates kitchens in Kitchener, Waterloo and Cambridge, Ontario, and builds the cabinets for them itself. Each cabinet is made to the room's measurements in the company's workshop in Mississauga, about 75 km east along Highway 401, and fitted in Waterloo Region by the same team. There is no Kitchener showroom: the consultation and the measure take place at home, and the quote arrives in writing, line by line, in Canadian dollars plus HST.

Line drawing of a kitchen run, numbered for the four parts of the job: 1 the walls behind the old kitchen, 2 the countertop and backsplash, 3 the sink and connections, 4 the trim and finish.
elevation, not to scale

Before anything new goes in

Protection for floors and furniture, careful removal and disposal of the old kitchen, a look at the walls and subfloor once they are exposed, and testing of any suspect older material before it is disturbed.

The surfaces

Help choosing the countertop, a template taken from the installed cabinets, coordinated fabrication, the backsplash, and a floor made level before the tile goes down, with what we supply and what you buy spelled out line by line.

The connections

Sink, faucet, dishwasher and appliance hook-ups, new lighting and outlets, and range-hood venting, by licensed trades, with permits wherever the work calls for one.

Finishing and handover

Drywall patches, paint, trim, appliances set in place, doors and drawers aligned, a thorough clean and a walk-through with care notes; opening a wall that carries load is assessed and priced on its own.

What does a complete kitchen renovation include?

Everything in the room: we protect the house, remove the old kitchen, repair what turns up behind it, then fit new cabinets, a countertop, backsplash and floor tile. Licensed trades connect the plumbing and wiring; paint, trim and a final clean end the job. A structural wall is priced on its own, and the written scope lists every item.

Why people call us, and why one team matters

Most kitchens in Waterloo Region come to us for one of three reasons. The cabinets have given up: doors that will not close, swollen boxes under the sink, drawers on their last runners. The layout never worked: a fridge door that hits the island, no counter beside the range, a corner nobody can reach. Or the house is changing hands, a family is growing, or someone is finally staying put and wants the room they have pictured for years.

Whatever the reason, a renovation is a sequence of trades in a small room, and most of the stress comes from the hand-offs: the cabinet supplier blames the installer, the installer waits on the countertop shop, the plumber cannot come until Thursday. We remove most of those hand-offs by making the cabinets ourselves and installing them with our own team. The countertop, plumbing and electrical connections are coordinated by us and done by licensed trades, on one schedule, under one written scope.

That scope is the most useful document in the whole project. It lists every item (what we supply, what you supply, what is included in the price and what is not) so nobody is surprised in week three. If you already own tile you love or want to buy your faucet, it goes in the scope as yours. If a wall turns out to hide a problem, the change is written down and priced before anyone keeps working.

At a glance: area, workshop, quotes, hours
Where we work
Kitchener, Waterloo, Cambridge and the Region of Waterloo townships; Guelph by arrangement
Workshop
Mississauga, Ontario: about 75 km along Highway 401, roughly an hour in normal traffic
Showroom
None in Kitchener: we design in your home
Quotes
In writing and line by line, in CAD plus HST
Consultations
Consultations by appointment [TBC]
Reply time
within one business day [TBC]

Kitchens first, then the rooms around them

The workshop that builds your kitchen cabinets also builds vanities, closets, media walls and built-ins, so the rest of the house can match.

1 / 7

What each service includes

Every job is measured in your home and quoted in writing first. Open a service for its full scope.

Full kitchen renovation

Everything in the room, handled as one job: we protect your floors, take the old kitchen out, fix what turns up behind it, then fit new cabinets, a countertop, backsplash and floor tile, bring in licensed trades for the plumbing and wiring, arrange any permit, and finish with paint, trim and a clean, working kitchen.

The four parts of the job, above

Kitchen cabinets, made to measure

Cabinets built for one room in our own workshop: base, upper and tall units, drawers, doors, panels, fillers and trim cut to your walls, plus pantry towers, islands, pull-outs and recycling centres, then delivered, set level, fixed to the wall and fine-tuned by the people who built them.

  • Measured and drawn first: the room, the appliances and what you need to keep, worked into a layout proposal and cabinet drawings before a single board is cut
  • Built to the drawings: boxes, doors, drawers, panels, fillers and trim made to the agreed construction, door profile and finish
  • Storage that is planned in: pantry towers, island cabinets, pull-outs, waste and recycling units and drawer organisers, with clearances worked out around every appliance
  • Fitted properly: hinges, slides, pulls and knobs (soft-close if you want it), then delivery, installation, levelling, fixing to the studs and a final adjustment of every door

Kitchen cabinets in Kitchener

Closets and built-in storage

Walk-in and reach-in closets, front-hall and mudroom units, linen and laundry cabinets and pantry shelving, planned around what you actually own and finished to match the rest of the house.

  • Closet layouts that fit what you own: long and short hanging, shelves, drawers and closed cabinets, in walk-in or reach-in closets
  • Fittings inside: rails at the right heights, shoe shelves, pull-out valet bars, racks for belts and ties, drawer inserts and baskets
  • Storage in the rest of the house: front-hall and mudroom units, linen and laundry cabinets, pantry shelving and built-in bookshelves, planned with damp rooms and airflow in mind
  • Installation: measured on site, checked for door clearance, fixed to the wall and finished with matching panels and handles; closet lighting and any wiring are quoted separately
Bathroom renovation

A bathroom rebuilt around a vanity from our own workshop: a new shower or tub, glass, tile on walls and floor, niches, toilet, taps, mirrors, lights and an exhaust fan, with the waterproofing and drains priced as their own lines and a permit wherever the plumbing changes.

  • The vanity and storage: a cabinet made for the wall, drawers planned around the plumbing, the top and basin chosen together, and a medicine cabinet or linen tower to match; one basin or two, depending on the room
  • The wet area: a new shower or tub, a glass panel or door, tiled walls and floor with built-in niches; the waterproofing membrane, the drain and the preparation behind the tile appear as separate lines on the quote
  • Fixtures and finishing: toilet, taps, mirrors, lighting, a fan that vents outdoors, accessories and paint, with who supplies what written into the scope
  • For later years: a curbless shower entry, a bench and solid backing in the walls for future grab bars, wherever the framing and the codes allow

Bathroom renovations in Kitchener

Bars and media walls

TV walls and media units with hidden storage and planned cable runs, and home bars with base and upper cabinets, a counter, bottle and glass storage and space for a drinks fridge, with or without a sink.

  • Media walls: a TV wall or console with display shelves and closed storage, designed around the equipment, airflow, access panels and cable runs before anything is built
  • Home bars: base and upper cabinets, a serving counter, open shelves, racks for bottles and glasses, an opening for a drinks fridge and wine storage
  • With or without water: a bar without a sink needs no plumbing; one with a sink needs a supply line and a drain, planned together with the counter, the circuits and the fridge
  • The details around it: panelling, lighting, cabinetry next to a fireplace and coordination with your audio-visual installer, each priced and planned to its own safety rules
Basement renovation and legal units

A basement turned into finished living space or a self-contained second home: water and insulation dealt with first, then framing, drywall, ceilings, floors, doors and trim; and for a legal unit, its own kitchen and bathroom, a way out in a fire, enough ceiling height, daylight, fresh air and fire-rated separation from the house above, all under a City building permit.

  • Finished space: a layout drawn around the beams and windows you have, insulation suited to a below-grade wall, framing, drywall, ceilings, floors, doors and trim. Finishing alone does not turn a basement into a legal unit
  • A self-contained home: its own kitchen, bathroom and bedroom, with the exits, room sizes, ceiling heights, windows, airflow and services the house can support
  • Safety built in: fire-rated separation from the house above, smoke and carbon-monoxide alarms and a way out in an emergency, reviewed by qualified designers and the City
  • The paperwork and the trades: a zoning check, drawings, the building permit, scheduling of every trade and each City inspection, with who does what written into the scope

Basement renovations and legal units

Custom millwork

Built-ins and architectural detail made for one wall: bookcases, shelving, display cabinets and fitted furniture, wall panelling, trim and mouldings, and range-hood surrounds that match the cabinets, all made from shop drawings in our workshop.

  • Built-ins: bookcases, cabinets, shelving and display units made for a particular wall in a particular house
  • Detail work: panelled walls, trim and mouldings, range-hood surrounds and panels finished to match the cabinetry
  • From drawing to wall: measured on site, drawn as shop drawings, samples approved, then built, delivered and installed, with responsibilities in the written scope
  • What we agree in writing: the board material, the edges, how the doors are made, the finish, the hardware, the fit and how to look after it

Countertops, backsplash and floors

We help you choose the countertop, arrange the templating once the cabinets are installed, and coordinate the fabrication, so the top is cut to the cabinets that are actually there rather than to a drawing. The backsplash and floor tile follow in the same schedule. Whether we supply a material or you buy it yourself is written into the scope line by line.

Comparing materials? Our guide to quartz, granite and porcelain countertops sets out the trade-offs.

Already have good cabinet boxes?

Sound cabinet boxes in a layout that works can stay. New doors and hardware, a new countertop and better lighting change the room for a fraction of the cost of starting over. Ask, and we will tell you honestly which route fits your kitchen [TBC: refacing as a job on its own].

A recent Kitchener project, photographed on site

A house in Doon South [TBC: operator to confirm the neighbourhood may be named]: a white shaker kitchen with mullion-glass uppers, a black slatted hood surround and veined quartz running up the wall, and a main bathroom with a workshop-built vanity and a black porcelain shower. Every cabinet came out of our workshop. The photos were taken on 23 September 2026.

1 / 4
Corner of the kitchen: an oval mullion-glass door between lit glass uppers, under crown moulding
Oval mullion doors on the corner uppers, with lighting inside.
Close-up of the black slatted hood surround meeting white upper cabinets and a veined quartz backsplash
The slatted hood surround, finished to sit tight against the white uppers.
Shower wall in black marble-look porcelain with gold veining and matte black fixtures behind a glass panel
Black marble-look porcelain and matte black fixtures in the shower.
Gas cooktop in a veined quartz counter, the quartz backsplash running up to the black hood surround, wide drawers below
The cooking wall: quartz run up behind the cooktop, wide drawers below it.

See every photo from this project

Five steps, and how distance changes them

Our workshop is in Mississauga, about 75 km along Highway 401, roughly an hour in normal traffic from Kitchener. Here is how a renovation runs at that distance without it ever becoming your problem.

1 / 5
  1. A first conversation

    By phone, email or the quote form: the room, what is not working, what you have in mind and the budget range you are comfortable with.

    Typical time: [TBC: duration]

  2. The in-home measure

    We measure the room, the services and the appliances in your house, booked on one of our Waterloo Region days.

    Typical time: [TBC: duration]

  3. Drawings and a written quote

    Layout and cabinet drawings, with a written quote that prices each part of the job in Canadian dollars, plus HST.

    Typical time: [TBC: duration]

  4. The workshop build

    Your cabinets are built in our Mississauga workshop while we book the trades and settle the countertop material; the top is templated once the cabinets are in.

    Typical time: [TBC: duration]

  5. Installation and handover

    The old kitchen comes out, the new one goes in, the countertop is set and everything is connected, then we walk you through the finished room with care notes.

    Typical time: [TBC: duration]

Waterloo Region days

We group measures, site checks and deliveries in Kitchener, Waterloo and Cambridge into set days instead of driving out for a single appointment. It keeps the travel line on your quote small, and it means your measure, your site check and your delivery are planned as part of a route rather than squeezed in.

The exact weekdays and how travel is priced: [TBC: Waterloo Region schedule and travel pricing]

Why there is no Kitchener showroom

A showroom shows you someone else's kitchen in someone else's light. We would rather stand in yours: measure the walls that are actually crooked, see where the window throws a shadow at four o'clock, and find the outlet the old backsplash was hiding. That is also why the first visit is a measure, not a sales pitch.

Is there a showroom in Kitchener?

No. We work the other way round: the consultation and the measure happen in your home, where the real room is, and the cabinets are made to those measurements in our own workshop in Mississauga, about an hour away. Our team brings them to Waterloo Region and installs them.

How long does a kitchen renovation take?

Most of the time passes before the first day on site: the measure, the drawings and the written quote, a building permit if plumbing or walls move (Kitchener reviews a complete house application within 10 business days), and the workshop build of made-to-order cabinets. Installation is the shortest stretch. Our current lead time is [TBC: lead time].

What a kitchen renovation costs in Waterloo Region in 2026

No contractor can price your kitchen without seeing it, and we will not pretend to. What we can do is show you the published local figures, explain what moves a kitchen up or down that range, and put our own written number in front of you after a measure.

1 / 3
  • Essential refresh

    $30,000–$55,000

    New cabinetry and finishes in the existing layout, no plumbing moves

  • Mid-range full renovation

    $55,000–$110,000

    Semi-custom cabinetry, quartz or stone counters

  • Premium / custom

    $110,000–$200,000+

    Custom millwork, a reconfigured layout, premium appliances

Market context from Caliber Contracting, Kitchener–Waterloo kitchen renovation cost guide (March 2026, checked 2026-10-23), not our prices.

How much does a kitchen renovation cost in Kitchener in 2026?

A Kitchener–Waterloo cost guide (Caliber Contracting, March 2026) puts essential refresh at $30,000–$55,000, mid-range full renovation at $55,000–$110,000, premium custom work at $110,000–$200,000 and up. Those are market figures, not our prices: we measure each kitchen first, then quote it in writing, in Canadian dollars plus HST.

Our own prices

We publish dated price ranges here only once they are confirmed in writing [TBC: our own date-stamped ranges by service]. Until then the honest answer is the one above: every kitchen is measured first, then quoted in writing, line by line, in Canadian dollars plus HST, with travel as its own line.

A second published view

PD Renovations, Waterloo Region kitchen renovation costs (April 2026, checked 2026-10-23), Kitchener column, not our prices.
TierPublished Kitchener range
Basic project$18,000–$32,000
Mid-range remodel$32,000–$55,000
High-end / custom$55,000+

Why the two guides disagree

They describe different kitchens. The first guide's lowest tier already means new cabinetry throughout; the second's basic tier includes smaller, partial projects. Both agree on what drives the number: the cabinets (which the first guide puts at 30–40% of the total of the total), then whether plumbing or walls move, the countertop and the appliances. The first guide also advises a 10–15% contingency contingency on top, which we agree with for any house built before 1980.

What moves the price

FactorKeeps it lowerPushes it higher
LayoutSink, range and fridge stay where they areMoving a drain, a gas line or a wall; adding an island with a sink
CabinetsStandard sizes, a simple door, fewer pull-outsFull-height pantry walls, glass fronts, inside lighting, specialty storage
CountertopOne material, a plain edge, fewer seams and cut-outsThicker slabs, waterfall ends, a full-height slab backsplash
Electrical and lightingExisting circuits and fixture positions reusedNew circuits, under-cabinet and in-cabinet lighting, a panel upgrade
Floor and backsplashTile only within the kitchenFlooring carried into connected rooms; large-format tile on uneven subfloors
AccessA detached house with a drivewayCondo elevator bookings and working-hour limits; for us, travel to the Region

How to keep the quote in your budget

  • Tell us the budget at the start. A design drawn to a real number beats a quote cut down later.
  • Decide early which appliances stay: their sizes fix the cabinet openings.
  • Keep the wet wall where it is unless the layout truly fails.
  • Spend on what you touch every day (drawers, hinges, the counter) and save on what you only look at.

Want the long version, with what each tier actually buys? Read our 2026 cost guide for Kitchener–Waterloo.

Kitchener, Waterloo, Cambridge and the townships

Houses across the Region come in a handful of shapes, and each shape has its own kitchen problems. Knowing which one you live in tells us a lot before we arrive.

Schematic map of the service area: Kitchener in the centre, Waterloo to the north-west, Cambridge to the south-east and Guelph to the north-east, inside a dashed circle about 25 km across, with Highway 401 running east toward the workshop in Mississauga.
Where we work: Kitchener, Waterloo and Cambridge, the Region of Waterloo townships, and Guelph by arrangement. Schematic, not to scale; the dashed circle is roughly 25 km. There is no Kitchener showroom; we come to you.

Kitchener

We work right across the city: Downtown Kitchener, Victoria Hills, Westmount, Forest Heights, Stanley Park, Huron Park, Lower Doon, Doon South, Pioneer Park, Williamsburg, Country Hills, Laurentian Hills, Bridgeport. The housing is older than many people assume: 48.6% of Kitchener's occupied homes were built in 1980 or earlier, and 19.1% in 1960 or before (Statistics Canada, 2021 Census). Westmount, for example, was begun in 1912 and only partly built out until after the Second World War, according to the City's heritage study. An older kitchen is often a closed room at the back of the house, with plaster walls and a chimney or plumbing stack in an awkward place; a mid-century side-split or back-split puts the kitchen a half-level up, beside a dining room whose wall many owners want opened; a newer house usually has a sound open layout that needs better cabinets, counters and storage rather than new walls.

Waterloo

From Uptown Waterloo, MacGregor-Albert, Mary Allen, Beechwood, Lakeshore, Laurelwood, Eastbridge, Westvale and Colonial Acres, Waterloo mixes some of the Region's oldest streets with its newest: MacGregor-Albert is the city’s oldest residential neighbourhood, on a 19th-century street plan, while only 32.9% of Waterloo's homes date from 1980 or earlier. Condo kitchens near the universities and Uptown bring the building's rules (approvals, elevator bookings, working hours) and we plan around them. More on our Waterloo kitchen renovation page.

Cambridge

Cambridge was formed in 1973 from Galt, Preston, Hespeler and the settlement of Blair, and each still has its own core. Older stone and brick houses in those cores often hide uneven floors and out-of-square walls, which is exactly where made-to-measure cabinets and scribed panels earn their keep; 22.7% of Cambridge homes were built in 1960 or before (Statistics Canada, 2021 Census).

The Region of Waterloo townships

We also travel to the townships: Woolwich (Elmira, St. Jacobs, Breslau), Wilmot (New Hamburg, Baden), North Dumfries (Ayr) and Wellesley [TBC: township service area]. Farmhouse and rural kitchens often need a fresh look at the water supply and drainage before the cabinets are drawn, so we ask about the well and septic system at the first call.

Guelph

Guelph is close enough to plan for, by arrangement. Ask when you send your quote request.

The numbers behind this
Statistics Canada, 2021 Census of Population, Census Profile (population, private households, 2020 average after-tax household income).
CityPopulationHouseholdsAverage after-tax household income (2020)
Kitchener256,88599,810$87,800
Waterloo121,43647,040$99,300
Cambridge138,47951,270$91,500
Occupied homes by when they were built: Statistics Canada, 2021 Census Profile (occupied private dwellings by period of construction, 25% sample data).
CityBuilt 1960 or beforeBuilt 1980 or earlierNeeding major repairs
Kitchener19.1%48.6%4.7%
Waterloo9.6%32.9%3.7%
Cambridge22.7%48.4%5.2%

About 198,120 private households in the three cities, and roughly half of Kitchener's and Cambridge's homes are old enough that a renovation should plan for surprises behind the walls.

Free, one email

The Waterloo Region renovation checklist

The notes we work through before quoting: when Kitchener, Waterloo and Cambridge want a building permit, what Ontario's Consumer Protection Act gives you, the six biggest cost drivers, and the months that book up first.

Get the checklist

Permits, inspections and who files what

The good news: most kitchen renovations need no building permit at all. The ones that do are predictable, and we flag them at the measure so they never become a surprise in the middle of the job.

Do I need a building permit to renovate a kitchen in Kitchener?

Not for new cabinets, countertops, tile or paint, or a sink swapped where the old one stood. The City of Kitchener requires one to add or move a plumbing fixture, remove a load-bearing wall, re-insulate walls, widen a window or door opening, or finish a basement. Electrical work is notified separately to the Electrical Safety Authority.

Usually no building permit

  • Painting, tiling and similar finish work
  • New cabinets and countertops
  • A toilet, tub or sink replaced with a new one in the same spot

A building permit first

  • Adding, removing or moving a plumbing fixture or drain
  • Removing or altering a load-bearing wall, column or beam
  • A new window or door, or a wider opening
  • Finishing a basement or creating an additional unit

Where the three cities differ

How long the City takes

Ontario's Building Code gives a building department 10 days, not counting weekends or holidays, to issue or refuse a permit for a house once the application is complete (O. Reg. 163/24, Division C, Article 1.3.1.3). The clock starts only when every document is in and the fees are paid. Kitchener reviews a complete residential permit application within 10 business days; interior alterations cost $0.37 per square foot ($95 minimum) plus a $250 fee refunded at the final inspection (checked 2026-10-23). Waterloo processes renovations to single-detached, semi-detached and townhouse homes in 10 business days and secondary units in 15, counted from a complete application.

Electrical and gas work

Electrical work is separate from the City permit. In Ontario anyone you hire for electrical work must be a Licensed Electrical Contractor, who files a notification of work with the Electrical Safety Authority before starting and arranges the inspection; you receive a Certificate of Acceptance once it passes. Even new pot lights are notified. Gas work needs a TSSA-certified gas technician. You can confirm a contractor's licence with the ESA contractor lookup.

Who applies, and which drawings

If your project needs a building permit, the written scope says who applies and which drawings the City wants. Kitchener, for one, asks for the kitchen or bathroom layout [TBC: who applies by default]. Our permit guide goes job by job.

Where the old kitchen goes

The Region of Waterloo runs two transfer stations, at 201 Savage Drive in Cambridge and 925 Erb Street West in Waterloo, that accept waste generated within the Region only, with a $15 minimum on every load. Drywall is recycled when it is sorted from wood, tile and insulation; asbestos is accepted only at the Waterloo site, sealed and pre-approved, on Wednesdays. Source: Region of Waterloo.

Basements and additional dwelling units

All three cities now allow more than one unit on most residential lots, and each has its own rules for turning a basement into a legal apartment: Kitchener allows up to 4 units on a lot, Waterloo up to 4 with a rental licence before you rent, and Cambridge up to 3. Finishing a basement does not, by itself, make it a legal unit. Our basement renovation page walks through the differences, and our additional dwelling unit guide goes city by city.

When to start: the Kitchener renovation calendar

Demand for renovations in the Region is lumpy. The months when everyone calls are the months when every trade is booked.

Google searches for "kitchen renovation kitchener" made from Kitchener, Sep 2025 to Aug 2026 (Google Ads data via DataForSEO, pulled 2026-10-11). Google rounds these figures; read the shape, not a single month.
The monthly numbers, for three searches
Monthly Google searches made from Kitchener, 12 months to August 2026 (Google Ads data via DataForSEO, pulled 2026-10-11).
Month"kitchen renovation kitchener""kitchen cabinets kitchener""bathroom renovation kitchener"
Sep 2025720210590
Oct 2025170140260
Nov 20255070210
Dec 202570110210
Jan 2026140110260
Feb 2026709090
Mar 202670140170
Apr 202670110210
May 202670110260
Jun 20269090390
Jul 20264090170
Aug 20267090170

When is the best time to start a kitchen renovation in Kitchener?

Start planning in the quiet months. Searches for kitchen renovation from Kitchener peaked in September 2025 at about 10 times a typical month (Google Ads data, 12 months to August 2026), so a design signed in winter or early spring usually reaches the schedule ahead of the autumn rush.

1 / 3
  • Winter: design

    The quiet months are the best time to measure, draw and settle the quote. Decisions made calmly in January are rarely regretted in June.

  • Spring: build

    With a signed design, the workshop can build while you finish choosing tile and fixtures, and installation lands before summer holidays scatter everyone.

  • Autumn: book early

    The September spike is real. If you want a new kitchen before the holidays, the drawings need to be finished well before the leaves turn.

Your rights, and how to check any contractor

Ontario's Consumer Protection Act sets clear rules for renovation contracts. Knowing them protects you, whoever you hire, including us.

Line drawing of a renovation contract: five ticked boxes down the page and a signature at the bottom, with a pen lying beside it.
check first, then sign

What the law says

  • Above $50, a renovation contract has to be in writing.
  • A contract signed in your home is a direct agreement: you can cancel for any reason until 10 days after you receive the written copy, and any deposit comes back within 15 days.
  • The Province recommends a deposit of no more than 10 per cent of the project.
  • A contractor cannot charge more than 10 per cent above the estimate in the contract unless you ask for more or different work and sign for it.
  • Changes during the job should be written down: scope, price and schedule.
  • If you never received a written copy that meets the rules, you can cancel within one year.

Source: Ontario: guide for home renovation and roofing businesses (Consumer Protection Act) (checked 2026-10-23).

Five checks before you sign, with anyone

  1. Ask for a current WSIB clearance certificate: it shows the company's workplace-insurance account is in good standing, which protects you from liability for its unpaid premiums.
  2. Ask who the licensed electrical contractor is and check the licence number with the Electrical Safety Authority's contractor lookup; you should receive an ESA Certificate of Acceptance when the work passes.
  3. Ask for a certificate of liability insurance.
  4. Read the workmanship warranty: what it covers and for how long.
  5. Ask to see a kitchen the company finished at least a year ago.

Our own answers

Insurance [TBC: insurer and coverage], WSIB clearance [TBC: certificate] and workmanship warranty [TBC: length and cover] are set out on our warranty and contracts page, with the documents shown with every estimate.

What Kitchener homeowners ask us most

More answers in our planning guides, including how long a renovation takes and how to choose a contractor in Waterloo Region.

Ask us about your kitchen
Costs and budgets · 8
What is the average cost of renovating a kitchen in Ontario?

There is no official average. Published contractor guides are the usual reference, and they disagree because they define their tiers differently. For Kitchener–Waterloo, a Kitchener–Waterloo cost guide (Caliber Contracting, March 2026) puts essential refresh at $30,000–$55,000, mid-range full renovation at $55,000–$110,000, premium custom work at $110,000–$200,000 and up. The size of the room, whether plumbing moves, the cabinet type and the countertop decide where a kitchen lands, which is why only a written quote after a measure is worth planning around. See what moves the price.

How much does it cost to renovate a kitchen in Canada?

About $30,944 on average, according to HomeStars' Canadian cost guide (updated August 2026), with homeowners reporting $16,402 to $45,618; that average spans minor updates and major renovations. Caliber Contracting's Kitchener–Waterloo guide (March 2026) starts higher, at $30,000–$55,000, because its lowest tier already means new cabinets throughout. These are market figures, not our prices: we measure each kitchen first, then quote it in writing, in Canadian dollars plus HST. See what moves the price.

What is the most expensive part of redoing a kitchen?

Usually the cabinets. Caliber Contracting's March 2026 Kitchener–Waterloo guide puts cabinetry at 30–40 per cent of a typical project, ahead of the countertop, appliances and labour. Moving plumbing, a gas line or a wall can rival it, which is why keeping the sink, range and fridge where they are is the biggest single saving in most kitchens.

Can you renovate a kitchen for $30,000?

Often, if the layout stays where it is. At that budget the money usually goes into cabinets and a countertop, with the sink, range and fridge kept in their current spots so no drain or gas line moves. A smaller kitchen, a simpler door style and a countertop with a plain edge stretch it further. For comparison, a Kitchener–Waterloo cost guide (Caliber Contracting, March 2026) puts essential refresh at $30,000–$55,000, mid-range full renovation at $55,000–$110,000, premium custom work at $110,000–$200,000 and up (market figures, dated).

Tell us the number when you ask for a quote. We would rather design to a real budget than send a quote you have to cut in half.

Can I get a new kitchen for $15,000?

A small kitchen, occasionally, if the layout stays put, the cabinets are simple and the countertop is modest. More often, $15,000 buys a partial update. One Waterloo Region contractor's published ranges (PD Renovations, April 2026) start a basic Kitchener project at $18,000–$32,000, and the higher-end guide in our pricing section starts a full refresh at $30,000. Tell us the budget and we will say plainly what it buys.

Can you renovate a kitchen for $10,000?

Not a full renovation. Ten thousand dollars typically covers one part of a kitchen (a new countertop and backsplash, new doors and hardware, or new lighting) rather than new cabinets throughout. If that is the budget, say so: we will tell you plainly which part of the room gives the most change for it, even when the answer is not cabinets.

Is $10,000 enough for a new kitchen?

For new made-to-measure cabinets in every run, no: the cabinet boxes, doors, hardware, countertop and installation add up past that in almost any kitchen. It can be enough for a small, specific upgrade, or as the first stage of a renovation done in phases, which we are happy to plan.

What deposit do you ask for?

[TBC: deposit and payment schedule] For context, Ontario recommends a deposit of no more than 10 per cent of the project cost, and every renovation contract over $50 must be in writing. Our warranty and contracts page sets out how we work.

Design, cabinets and materials · 5
What will kitchens look like in 2026?

Warmer, simpler and better lit, if the industry's forecast holds. In the NKBA | KBIS 2026 Kitchen Trends Report (September 2025, 634 kitchen professionals), transitional style topped the list at 72%; 69% saw flat slab doors gaining, and 59% saw wood-grain cabinets overtaking painted ones. Three in four saw slab backsplashes gaining, and the most popular lighting sits under the cabinets (82%) and inside them (72%). The Kitchener kitchen in our photos is that transitional mix: shaker doors and crown moulding, with veined quartz run up the wall and lit glass uppers.

What makes the biggest difference in a small kitchen?

Height, drawers and light. Upper cabinets taken to the ceiling add storage without using floor space; deep drawers in place of base-cabinet doors bring the back of every cabinet within reach; and a corner pull-out uses the space a blind corner wastes. Lights under the uppers make a narrow counter far easier to work at. Where an appliance crowds the room, an 18-inch dishwasher, a 24-inch range or a counter-depth fridge gives space back. Our condo kitchen guide covers the tightest rooms.

What is the best material for kitchen cabinets?

For the boxes, plywood and good-quality particleboard or MDF all work when the joints, edges and hardware are good; what fails first is usually a cheap hinge, a weak drawer slide or edge banding that lets water in under the sink. For doors, painted MDF suits smooth modern doors, solid wood frames suit shaker and raised-panel styles, and melamine or thermofoil are hard-wearing and economical. Our own construction is [TBC: box material and finishes made in-house].

Can I keep my appliances?

Yes, if they suit the new layout. Give us the make and model of each appliance before the drawings are final so the openings are built to its exact size. A new appliance chosen after the cabinets are made may not fit the space drawn for the old one.

Can I buy my own countertop, tiles or fixtures?

Yes. The written scope separates what we supply from what you buy, so you can source tile, a countertop or a faucet yourself. We need the products, or at least their specification sheets, early, because cabinet heights, floor levels and sink cut-outs are drawn around them.

During the job · 4
Will I have a working kitchen during the renovation?

Not for most of it. Set up a temporary kitchen elsewhere in the house: a fridge, a kettle, a microwave and a table go a long way. We tell you in advance which days the water and power will be off, so you can plan around them.

Where does the old kitchen go?

Out with us, sorted. The Region of Waterloo runs two transfer stations, at 201 Savage Drive in Cambridge and 925 Erb Street West in Waterloo, that accept waste generated within the Region only, with a $15 minimum on every load. Drywall is recycled when it is sorted from wood, tile and insulation; asbestos is accepted only at the Waterloo site, sealed and pre-approved, on Wednesdays. If any suspect material is found, it is tested before it is disturbed and removed by a qualified contractor.

Could there be asbestos in an older Kitchener kitchen?

In older homes it is possible in some floor tile and its adhesive, drywall joint compound or plaster, and about half of Kitchener's homes were built in 1980 or earlier (Statistics Canada, 2021 Census). Suspect material is tested before anything is disturbed; if removal is needed, a qualified abatement contractor does it, and the Region of Waterloo accepts asbestos waste only with pre-approval.

Who applies for the building permit?

The written contract names who applies. In Ontario the owner or an agent acting for the owner, such as the contractor, can apply to the City for a building permit; the scope also lists the drawings the City asks for [TBC: our standard practice]. Not every kitchen needs one: see permits.

Where we work, and other rooms · 3
Do you charge for travel to Waterloo Region?

Travel appears as its own line on the written quote, so you see exactly what it adds [TBC: how travel is priced]. We group measures and site visits in Waterloo Region into set days, which keeps that line small.

Do you renovate condo kitchens in Uptown Waterloo and Downtown Kitchener?

Yes. A condo adds the building's own rules: written approval from the board or property manager, elevator bookings, permitted working hours, and sometimes a deposit against damage to common areas. We plan cabinet delivery and noisy work around those rules. Our condo guide covers the details.

Do you renovate bathrooms and basements too?

Yes: full bathroom renovations with a vanity from our workshop, and basement finishing and legal additional units. Closets, media walls, bars and custom millwork come from the same workshop.

Warranty and getting started · 2
What warranty do you give?

[TBC: workmanship warranty, length and cover] Cabinet hardware, appliances and countertops can also carry their makers' own warranties, which we pass on with the paperwork at handover.

How do I get a quote?

Use the quote form or email info@kitchenrenovationkitchener.ca. We reply within one business day [TBC: reply-time promise], book an in-home measure on one of our Waterloo Region days, then send drawings with a written, itemised quote.

Tell us about the room

A few lines are enough. We reply within one business day [TBC: reply time], book a measure in your home on one of our Waterloo Region days, and send drawings with a written, itemised quote. No obligation, no pressure.

Prefer email? info@kitchenrenovationkitchener.ca

Also from our workshop: bathrooms, basements and custom cabinets.

Line drawing of an L-shaped kitchen in plan: cabinets along two walls with the sink under the window and the range on the side wall, an island, the fridge and the door's swing, with blank dimension lines where the measurements go.
plan, not to scale
What is the project?

We use your details only to answer this request. Privacy.

On this page
    Back to topFree quote
    Menu
    Get a free quoteinfo@kitchenrenovationkitchener.ca